39.4.1 CONTROL
Control is assuring that plans are carried out effectively and efficiently. It provides a systematic
and methodologic approach to ensuring compliance. It enables early detection and correction of mistakes. It may be internal
(due to taqwa and thawaab)
or external (due to rewards and punishment). It may be pre-action, concurrent, or post implementation. Project costs must be controlled by making sure that the operational budget is within the approved budget. No amount
of control will get good results out of demotivated, weak-willed workers. Managers must be given enough authority to resolve
control issues in areas of their responsibility. A good control system must be flexible, timely, accurate, cost-effective,
understandable, acceptable, and objective. The steps of the control process are (a) setting standards, criteria, or objectives;
(b) measurement of actual performance; (c) comparing actual to expected standards; (d) and taking corrective action. Base
plans can be changes as a result of control activities. The control program can fail due to resistance, inaccurate information,
rigid bureaucracy, negligent management, too rapid changes, and an overstretched organization. Continuous quality improvement
(QI) is a management philosophy that is committed to continuous and consistent improvement in quality. It is consistent with
the Islamic concept of ihsaan that calls for continuous human improvement.
Quality assurance or quality improvement is a type of control.
39.4.2 EVALUATION
The objectives of evaluation are Assess whether objectives were
achieved, Assess efficiency, Assess effectiveness, and Learn from experience. Its benefits are: Identify success and reinforce,
Help management see areas of weakness and improvement, Reassure workers that they are moving well, reassure stake-holders,
Gain confidence of supporters and donors, If the results of an evaluation process are not used to improve future performance
the evaluation has not achieved its pupose. Evaluation may be process evaluation or outcome evaluation. It may be internal
or external. It may be during project implementation or at the end of implementation. The basis for evaluation in the Qur'an
and sunnah is the individual accountability as well as the reward and punishment. Data for evaluation can be collected by
Direct observation, Questionnaire, Interview, End-product, Records review, and Performance/knowledge tests. Self-evaluation
is very difficult but yet very important. Only the most mature, most self-confident, and most sincere people are capable of
looking at themselves in mirror and deal objectively with their performance, negative or positive. Projects are evaluated
on the criteria of keeping the schedule, finishing within budget, meeting all project objectives, and meeting stakeholder
expectations.
|